RFP & buyer’s evaluation checklist: 6 questions vendors avoid

Every detection system — radar, electro-optical, laser or AI camera — is governed by the same fundamental trade-off between sensitivity, detection time and false alarm rate. If you are drafting a Request for Proposals (RFP) or evaluating vendor responses, insist on written answers to these 6 items, and run the numbers in the calculator.

01 · Detection performance

Probability of detection (Pd) vs. scan speed and “AI”

Vendors lead with scan times (“full runway in 60 seconds”) and machine-learning object lists because both are easy to state. Neither governs risk. Under six-hourly manual checks, every missed item stays on the runway for an average of 180 minutes. As the Risk Calculator demonstrates, a slow system that detects 99% of debris beats a fast system that detects 90% by a wide margin.

Read: “AI” is the new “detection time” →

What to specify in the RFP Demand a measured probability of detection across a seeded target set — including low-permittivity non-metallics (rubber, plastic, spalled concrete) as well as metal — at maximum operating range, at night, and on a wet surface.
02 · Operational trust

False alarm rate (FAR) on wet asphalt, snow and heat haze

Any sensor can be made more sensitive by lowering its detection threshold, and the price is always paid in false alarms. Standing water puddles (170+ rain days a year at Singapore Changi), snow banks and thermal shimmer trigger nuisance alerts. An operator flooded with false alarms stops trusting the display and clears alerts without an inspection — driving effective Pd to zero.

Read: How Changi cut iFerret false alarms more than tenfold →

What to specify in the RFP Contractually cap false alarms per runway per 24 hours across rain, standing water and snow, verified over an acceptance period that spans a full winter or monsoon season (as Hong Kong required across eight months).
03 · Airfield geometry

FAA AC 150/5300-13 obstacle clearance and tower blind spots

Tower-mounted radars and cameras require clear line-of-sight to the far runway edge without penetrating the Primary Surface (1,000 ft wide), the 7:1 Transitional Surface, or the Taxiway Object Free Area (386 ft for Group VI aircraft). Double parallel taxiways can push towers beyond 1,000 ft from the centreline, while ground that slopes away outside the taxiway forces taller towers or creates coverage gaps.

Read: Site design & deployment geometry at Atlanta (ATL) →

What to specify in the RFP Require a complete site design overlaid on your airfield’s obstacle-free surfaces, showing exact sensor ranges, grazing angles, terrain elevations and any blind spots caused by taxiways or parked aircraft before contract award.
04 · Capital & civil works

Airside trenching, power, fibre and runway closures

Sensor hardware is frequently less than half the installed cost. Edge-light systems avoid tower siting rules but require power, high-bandwidth data links and optical alignment at dozens of runway-edge light cans. Tower systems require deep foundations, frangibility engineering and cable trenching across active movement areas.

Read: The cost of a FOD system — an infographic →

What to specify in the RFP Separate sensor capex from airside civil works, specify how many night runway closures are needed for installation and calibration, and price ten-year spares and preventative maintenance upfront.
05 · Concept of operations

Retrieval time (tr), runway capacity and inspection rules

A sensor only reports coordinates; the debris stays on the runway until a vehicle drives out and picks it up (td + tr). Furthermore, FAA Advisory Circular 150/5210-24A explicitly states that automated FOD detection supplements airport personnel — it does not allow an airport to cancel its scheduled manual runway inspections.

Read: The FAA rewrites its FOD management guidance →

What to specify in the RFP Define the exact triage workflow in the tower/AOCC: how an operator visually confirms whether an object warrants stopping departures, and what retrieval time assumption holds during peak movement banks.
06 · Lifecycle dependency

Supplier longevity and 20-year software ownership

A runway detection system is a twenty-year infrastructure asset sold by a small industry. Stratech won the largest contract in the history of the field (HK$280m at Hong Kong) and was ordered into compulsory liquidation five months after commissioning. Changi only preserved its installation by rebuilding the detection software in-house with NCS.

Read: The end of iFerret — Stratech wound up in 2018 →

What to specify in the RFP Mandate source-code and model-weight escrow, documented sensor APIs, and local systems-integrator rights so the airport can maintain and recalibrate the system if the original vendor exits the market.

Next in the guide: Standards, regulations & mandate tracker →